Dock, wash, and clean the exterior surfaces of two (2) YC barges. Additionally, blast and preserve three (3) tanks for one of the barges. And, conduct maintenance of a second barge. Maintenance of second barge may include, but is not limited to, replacing Zincs, blasting and preserving of Hull/Freeboard/Main Deck/Tanks, visual inspection of Hull/Freeboard/Main Deck/Tanks, replacing hardware for tank covers, and Air tests of tanks.
Matthew E Kohler, Contract Specialist, Phone 3604761356, Email matthew.e.kohler@navy.mil - Gary Binder, Contracting Officer, Phone 360-476-5706, Email gary.binder@navy.mil