Scope of work for this project will include labor, materials, appliances, tools, equipment, etc. as required to perform all work as specified in the contract documents. The work identified in the contract documents show modifications and additions to the cathodic protection system and the installation of isolation valves for the underground fuel lines at the BNIA Fuel Farm.
Work associated with cathodic protection includes replacement of test stations, anodes, header cables, wire leads; and the installation of new cathodic protection at two locations on the underground fuel lines and at the oil/water separator.
Work associated with the fuel line isolation valves includes the installation of twenty three butterfly valves, ten ball valves, and seven pressurization ports.