The Work of this Contract is the *********** of a 3,350 ton chiller at the Central Utility Plant (CUP), 2,500 ton chiller *********** at Utility Plant 1 (SUP1), the ******** of an 1,178 ton Heat Pump Chiller at Utility Plant 2 (SUP2), and all ass...Texas,
United States
The Authority is in * from in * * services to water systems as part of Phase II of the Water Loss Control * project It is * the ********** will be for tasks...Georgia,
United States
Construct a around the Data ********* The wall will be at least 1' above the 500 year flood plain. Flood gates, sump pumps and * storm sewer tie-in are also The ********** of chilled water lines and of new CRAC unit is also *...Texas,
United States
Work includes removal of cross drain pipe and with 77 LF of 5 FT X 4 FT Work also includes of ***** 700 LF of pipe and inlet and outlet *** of curb and gutter, asphalt paving and oth...Georgia,
United States
Furnish labor, materials, and for ** of * to include **** 3,220' of 4" PIP * pipe, pump stand with appurtenances, risers, valves, **** 3,270' power cable, panel board, ************ etc. ...Texas,
United States
The Authority the of a ********** to provide material, ******** and ************* for the of Fire Alarm, and ************ Systems as defined.District Of Columbia,
United States
The principal items of work and are: to ********* and plug one (1) orphan oil/gas well, ********* to be 3,500 feet in depth, to *************** to prepare and restore well site; and to and de Bid cost $10 per ...Pennsylvania,
United States