The proposed improvements consist of streambank stabilization of approximately 200 linear feet of the east and west banks. Work items include; construction of a concrete headwall, removal of the existing sheet pile wall and replacement with either a stacked concrete block wall, or new sheet pile wall, and placement of Illinois Gradation RR-5 crushed stone for streambank stabilization.