The City is requesting bids from qualified contractors for streambank stabilization and erosion control. The bid will include but not be limited to the proposed project of the placement of approximately 250 tons of crushed stone to reinforce an eroded streambank, and two erosion gullies which are threatening to damage an existing recreational trail.