The Work covered by these contract documents includes Dynamic Var Compensation installations at
two distinct substation locations within the Keys Energy transmission system. The CONTRACTOR shall
execute the Work in a schedule which gives priority to the completion of the Stock Island Generation
Facility Substation work.