This project includes the rehabilitation of approximately 14,676 LF and gravity sewer mains, various sizes, with cured in place liner, the rehabilitation of 63 manholes with cementitious epoxy liner and related collection system point repairs.
The contractor shall be responsible for providing all labor, supervision, trade skills, materials, and equipment required for this project as described in the Specifications.