Department of Environmental Protection, Division of Recreation and Parks, Bureau of Design and Construction
The Contractor shall provide the necessary labor, materials, equipment, and supervision required to construct the two wastewater lift stations; 1,320 LF 8'' gravity sewer; 2,350 LF of 4'' and 450 LF of 3'' wastewater forcemain to connect to Sarasota County; abandon existing septic systems according to the plans and specifications.