It is the purpose of the resulting agreement to furnish and deliver, if and when ordered, to the District, all required services and materials necessary to accomplish the Lake Hancock Lake Level Modification (H008) P-11 Structure Replacement described in the drawing, figures, and other reference documents. The terms and conditions of this RFB are incorporated into any resulting contractual relationship between the Contractor and the District. The Lake Hancock Lake Level Modification (H008) P-11 Structure Replacement involves raising of the Lake Hancock elevation to an elevation of 100.00 feet NGVD to provide additional storage which may be slowly released during dry season to aid in meeting established minimum flows downstream in the Peace River.