The Work generally consists of converting a majority of the Field from a 4.16 kV overhead distribution system to an underground 12.47 kV power distribution system. Contractor shall remove and dispose of electrical components which were not used on existing system including, but not limited to, various pad mounted and overhead pole transformers, power distribution poles, overhead conductor, surge arresters, etc.