The project is generally described as provide all materials, labor, equipment and transportation necessary for the demolition and disposal of the Atlee Road Water Storage Tank (250,000-gallon welded steel ground storage tank), pump station structure, two 5,000-gallon hydropneumatic tanks, and associated onsite piping and utilities. All work shall be as described in the Specifications and shown on the Drawings.