SCOPE OF WORK: The work includes all labor, equipment, materials to install new SCADA relays, and at the same time remove old relays and replace with new substation switchboard wiring. Install new DC battery back-up system. Bidders will have to pre-qualify to bid the project. Eligible bids will be evaluated based upon lowest bidder (Base+Alternates) within available budget limitations.