The project consists of pump station modifications to support installation of a new transmission
main, including rehabilitation of pumps and wells, installation of adjustable frequency drives,
new well screens, installation of two natural gas powered generators and associated fuel system,
stands, concrete pads and conduit. The project also includes the installation of two granular
activated carbon (GAC) units.