The project will include, but not be limited to, the following major categories of work:
Rehabilitate Wells Nos. 10 and 11 including performing pre- and post-flow tests, pulling and reinstalling pumps, and performing chemical and neutralizing treatments. Well 15's work will include pulling, bail oil, performing pump inspection, repairing as necessary and reinstalling.