The project consists of furnishing all materials, tools, equipment and labor as specified in the bid documents necessary to replace the existing waterlines. The project involves the installation of approximately 4,250 linear feet of 8-inch waterline and appurtenances. The project also includes installing new water service laterals; transferring existing water services; removing existing standpipes, fire hydrants and pressure reducing valves; installing new fire hydrants; installing new pressure reducing valve assembly; and all incidentals in place complete.