The project involves furnishing all labor, tools, materials, and equipment necessary to construct approximately 2,700 linear feet of 12, 8, and 6-inch ductile iron pipe to replace an existing waterline. Work includes installation of fire hydrant connections, transfer of water laterals, connections to branch distribution lines, removal of existing standpipes and valves, and roadway restoration.