The project involves furnishing all labor, tools, materials and equipment as specified in the bid documents for application of a spray elastomer liner system to reline the 8.5 MG pre-sedimentation reservoir. The lining system shall be spray applied, 100% polyurea, fast cure, high-build lining system, and ANSI/NSF 61 approved.