The Project consists of the following major elements: obtaining all permits, furnishing all materials and equipment, and performing all labor necessary to install approximately 2925 linear feet of 54-inch diameter and 1550 linear feet of 12-inch diameter ductile iron pipe (DIP) water main and appurtenances