Construction of the Transmission Line No. 4 Joint Bonding Project, which comprises of installing joint bonds at approximately 1300 pipe joints, installing 14 test stations, the construction of 4 deep anode ground beds, and the associated private property access and restoration, and crossing and restoring of several County Roads and other such work as may necessary.