A MANDATORY Pre-Bid Conference will be held at 10:00 a.m. on Thursday, December 17, 2009.
Division I consist of water approximately 19.8 miles of water distribution line ranging in size from 24 inch
diameter to 2 diameter. Miscellaneous work includes valves, fittings, service connections, directional bore,
and appurtenances. Division II consists of a 300,000 gallon elevated water storage tank, tank foundation,
altitude valve, fencing, and appurtenances.