The objectives of this project are to create a combined potable water and fire water suppression system at the Correctional Facility to provide adequate flow and pressure to the existing systems, upgrade the water service to the Dormitory, a new sprinkler system for the Dormitory, a new hydrant system, and removal of the fire pond dam.