This project consists of, but is not limited to, 2” tap and corporation stop on existing water main, 2” curb stop, 1,985 l.f. of 2” IPS HDPE waterline, cutting and coring concrete for water penetration into existing control buildings, interior plumbing and installation of water meters and associated site work including incidentals to complete the project.