The Project consists of the following major elements: obtaining all permits, furnishing all materials and equipment, and performing all labor necessary to replace approximately 15,903 linear feet of existing water main of varying sizes and types with 8-inch and 12-inch diameter ductile iron pipe (DIP) as shown in the Project Drawings along streets in city and replacement and installation of fire hydrants along the project route.