The project consists of the replacement of approximately 3,400 linear feet of 4-inch transite and 6-inch (material
unknown) water main with 6-inch ductile iron water main, the transfer of 39 services to the 6-inch ductile iron
water main, abandonment (in place) of approximately 1,200 linear feet of 3-inch cast iron water main within an
easement, and milling and overlay of asphalt pavement.