Optional pre-bid meeting 02/11/2010.
The project consists of the following major elements: obtaining all permits, furnishing all materials and equipment and performing all labor necessary to replace approximately 15,903 linear feet of existing water main of varying sizes and types with 8-inch and 12-inch diameter ductile iron pipe (DIP) as shown in the project drawings along streets, and replacement and installation of fire hydrants along the project route.