Furnish and install approximately 1,900 linear feet of 8-inch water line, 80 linear feet of 6 inch water line, one (1) new access base and manhole along an existing 42-inch” PCCP water main at an existing 20-inch construction access port. Install approximately 1,125 linear feet of city furnished 2-inch polyethylene gas pipe, 40 linear feet of 1-inch polyethylene gas pipe and other work as necessary as shown in the Approved Plans and Specifications.