PROJECT DESCRIPTION: The water line replacement consists of the installation of 2,600 +/- feet of 12" diameter welded steel pipe, connection to existing pump station and existing water line, abandoning existing piping and two existing pump stations, and associated site work. The water line may be constructed in two phases, fall 2011 and spring 2012, dependant upon weather.