The work of this project includes installation of approximately 25,000 lineal feet of 10� through 16� diameter reclaimed water distribution piping in parallel with approximately 25,000 lineal feet of 8� and 10� diameter wastewater forcemain together with all applicable removals, restoration, and appurtenances.