Mandatory pre-bid conference 06/09/2010.
The purpose of the project is to upsize the existing water lines in an effort to meet the growing demand of water due to the re-development in the area. The work consists of upsizing existing 2-inch, 4-inch, 6-inch & 8-inch water lines with approximately 1,345 linear feet of HDPE DR9 Class 200 Fusion Welded water line; 385 linear feet of 12-inch Ductile Iron (DI) Class 350 water line; 470 linear feet of 12-inch Ductile Iron (DI) Class 51 water line; 9,131 linear feet of 12-inch C-900 PVC water line; 40 linear feet of 6-inch PVC SDR 26 wastewater line; 1570 linear feet of 8-inch PVC SDR 26 wastewater line; and 11 Private Lateral water line service relocations.