Work consists of but is not necessarily limited to a renovation of the existing waste water treatment plant including demolition, new stair screen/wash press at headworks, new submersible pumps system, re-lining and retrofitting existing lift station (or at Contractor’s option replacing lift station entirely), new auto dialer and alarm system, re- construction of the two primary retention ponds complete with sludge removal/disposal, liners, concrete slope stabilization/protection and leak detection, associated mechanical, plumbing, electrical and controls work, and bypass pumping/temporary treatment controls to provide for continuous plant operations.