The City has issued this RFP for the sole purpose and intent of obtaining qualified firms for the the project. This project has two purposes. The first is to make process and hydraulic modifications to increase the wet weather flow capacity of the Wastewater Treatment Plant to 120 MGD and other improvements identified by the staff. The second purpose is to convert the existing chlorine disinfection system to a ultraviolet light disinfection system.