The City has issued this RFP for the sole purpose and intent of obtaining Design of capital improvements at Wastewater Pumping Station and Equalization Basin to add approximately 9.0 MG of detention storage within the existing facility, a new 17 MGD duty pump station and increased wet weather pumping capacity.