The RFP Database
New business relationships start here

Waste Digester Gas Utilization


Ohio, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The project consists of installation of a digester gas line from the digesters to the Service Building and Screen and Grit Building boiler systems; installation of a natural gas line from the Incinerator Building South to the West Aeration Control Building boiler system; replacement of the Service Building boilers; replacement of the burners on the West Aeration Control Building boilers; removal of three buried fuel oil tanks; installation of a power monitor panel and telemetry panel at the Compost Facility;

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP