Furnish labor, materials, equipment and incidentals necessary to install a buoy warning system complete in accordance with this specification and the applicable drawings. The warning system shall consist of seven (7) anchored buoys upstream of the labyrinth weir. Each buoy unit shall include the pyramid anchor, shackle, chain, swivel, can marker buoy, chain buoy, and light.