Utah Data Center


Utah, United States
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Project Description: The project consists of design and construction of a Tier III, 65 MW technical data center, located in Sandy, Utah. Basic ancillary supporting design and construction services include, but are not limited to: providing basic utility infrastructure, electrical service (primary power and temporary construction power), water, sewer, and gas. The facility itself will consist of approximately 1M SF of facility, of which 100K SF will be mission critical data center space with raised flooring and 900K SF of technical support and administrative space. Ancillary supporting facilities include, but are not limited to: water treatment facilities (pre and post), electrical sub-station(s), vehicle inspection facility, interim visitor control center, perimeter site security measures, fuel storage, water storage, chiller plant, fire suppression systems and 100% electrical generator and UPS back up capacity. The schedule will be very aggressive.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP