Work consists of providing and installing a 400kW generator set and transfer switch for building 515 and installing a new facility provided 230kW generator set for building 508 and provide and install a transfer switch for the 230kW facility provided generator. Both generators are to be installed in exterior pads protected by chain link mesh enclosures.