Construction of underground infrastructure in support of the UC2B fiber OSP including 33.91 miles of conduit (more or less) installed by horizontal directional drilling methods with 20.31 miles of fiber optic cable pulled and spliced along with associated appurtenances including but not limited to manholes, handholes, splice cases, route markers, surface restoration, testing and fiber validation.