The work includes approximately:
* 526 metres of watermain
* 1,200 cubic metres of rock excavation
* 13 pole bases
* 346 metres of 50 mm conduit
* 102 metres of 100 mm conduit
* 51 metres of horizontal directional drilling
* Associated asphalt, granular and sodding restoration