The Trunk Sewer Improvement Project involves the removal of a 30-inch sanitary sewer and enlargement, replacement, and rehabilitation of a 30-inch and 36-inch sanitary sewer.
Improvements involve enlarging approximately 2600 linear feet of 30-inch pipe to 48-inch pipe, replacing approximately 400 linear feet of 30-inch pipe, rehabilitating using cured-in-place pipe approximately 1900 feet of 30-inch and 36-inch diameter pipe and those items of work listed in the solicitation and as shown on the plans. The Contractor shall perform all labor, and furnish all materials, equipment, and incidentals required to make each item complete.