The work includes all labor, equipment, and materials required to remove 6 existing 5 kV building transformers and replace with a new padmount transformer. Provide new underground primary wiring. Provide new building Service, to include SE Panel, Revenue Metering, Surge Protection and a low voltage transformer and panel to reserve existing loads. Inclusive of all secondary wiring, accessories and connections.