Selected contractor will supply installation services for a 15kV Distribution Switchgear System at the Service Center. The installation will take place during the months of October, 2010 to January, 2011, depending upon the delivery of the actual switchgear equipment. The installation will require laying a concrete foundation for the new switchgear equipment, disconnecting the older switchgear, trenching for wiring, laying conduit, and connecting the new equipment.