DAS PREQUALIFICATION REQUIRED: YES
DOT PREQUALIFICATION REQUIRED: YES
Mandatory pre-bid meeting 03/19/2010.
The project consists of
the installation of bituminous concrete walks imprinted and colored as indicated,
grading, site lighting and electrical work, planting, pedestrian bridge at the
Pond Brook, and painted crosswalks.