The project shall provide for the removal and reconstruction of approximately 19 riser steps, 220 s.f. of 4" sidewalk removal and replacement and 200 lineal foot of 1-1/2" diameter black powder coated pipe railing. Any turf areas disturbed will be restored with topsoil and seed where required by Engineer.