The Street Retaining Wall Repair Project will provide for the repair of a 45-foot section of limestone retaining wall. This project also has an alternate bid to replace the entire section of the retaining wall (approximately 80 feet) with a concrete modular block wall system. This project will also include the replacement of curb and gutter, sidewalk and some street patching with hot mix asphalt.