Non-mandatory pre-bid meeting 04/29/2010.
The project will consist of: grading, excavation, rip rap stone installation, and stabilization in support of expanding an existing detention pond; and grading, slope stabilization and pavement installation in support of providing an expansion of the paved area at the Recycling Center.