This project includes removal of sediment from inside nine (9) detention vaults and thirteen (13) detention pipes. At each facility the Work includes the removal and disposal of all stored water and sediment. The Work also includes cleaning the Type II catch basins at one or both ends of the storm water pipes as shown on the site plans; and performing minor repair work as needed on the vault or pipe components.