Work includes removal of existing cross drain pipe and replacement with 77 LF of 5 FT X 4 FT reinforced concrete culvert. Work also includes installation of approximately 700 LF of stormdrain pipe and inlet and outlet structures, replacement of concrete curb and gutter, driveways, asphalt paving and other associated construction items.