The project includes off site manufacture and on-site installation of an in-situ Dual Phase
Extraction (DPE) Soil and Ground Water Environmental Remediation System. The manufactured
DPE system will consist of a vacuum pump, a moisture separator, an oil / water separator unit, an
air stripper, and vapor phase activated carbon vessels. The system will be housed in a equipment
enclosure that will be operated at the site.