The Contractor shall perform a minimum of 500 field visits to governmentally-owned public water systems and non-governmentally-owned public water systems located in Georgia. The field visits are for the purpose of providing Technical Assistance to the owners and/or operators of the system(s) in order to assist the water system to maintain and/or achieve the technical, managerial and financial capacity/capability to comply with State and Federal Drinking Water Regulations.