The replacement of approximately 2,039 linear feet of 8� and 6� concrete sanitary sewer pipe
with 12� PVC and 8� PVC sewer pipe, 8 – 54� diameter flat-top sanitary sewer manholes, 1 –
modification of an existing manhole which will include replacement of the top portion of
manhole and the abandonment of the existing outside drop connection and installation of a new
inside drop connection, installation of approximately 1,672 linear feet of 8� and 6� diameter
Cured-in-Place-Pipe (CIPP) and reinstatement and rehabilitation of approximately 36 side sewer
laterals utilizing CIPP , and associated asphalt roadway restoration. Manhole depths range from
approximately 6.5’ to 9.5’. Work will include CCTV post-installation inspection of the new sewer
facilities and repairs.